Application: It is used for the traction installation of power cable and communication cable and for the traction of conductor in the construction of power transmission and transformation lines. It can also be used in the oil field, mainly for the replacement of crane wire rope. When in use, one end is connected with the new rope and the other end is connected with the old rope. By the rotation of crane winch, the old rope can be replaced, which greatly saves labor.   Usage: When setting out in electric power construction, all kinds of steel cored aluminum strand, insulated conductor, ground wire, optical fiber, optical cable and cable can be connected through various types of paying off tackle, which has the advantages of light weight, large tension load, no damage to the line, convenient use, etc., and is the most ideal tool in electric power construction.   The single head type temporary mesh sock joints are specifically designed to temporarily connect the aluminum, steel…

Similar

Elevator spare parts compensation chain guide device
Elevator spare parts compensation chain guide device
wire mesh grip cable grip cable pulling sock
Pulling Grip Wire Rope
Pulling Grip Wire Rope
elevator compensation chain coated plastic
elevator compensation chain coated plastic
full plastic coated elevator compensation chain
full plastic coated elevator compensation chain
Plastic-coated compensation chain in elevator
Plastic-coated compensation chain in elevator
Elevator balance compensation chain part

Nantong Sanzhong Mechanical & electrical Equipment Manufacturing Co., Ltd.

Nantong Sanzhong Mechanical & electrical Equipment Manufacturing Co., Ltd. is a manufacturer sp…

Copyrights © 2025 astszcmparts.com All Rights.Reserved .