Poor efficiency of multi-machine coordination?   After drilling rigs are used to drill holes, it takes 1 hour for drilling and splitting machines to enter the site. Excavator converted drilling rigs also need to vacate the site, and equipment idleness has become the norm - this is an old problem in hard rock construction. Do you often watch the daily workload stuck in a bottleneck due to equipment connection faults? The drilling and splitting machine is here to break the deadlock: it is not only a drilling expert, but also a splitting main force. Its "independent" character can connect the entire crushing process. In limestone mining, it does not require the cooperation of other equipment. It splits immediately after drilling (100-200mm aperture). The daily processing volume is 200 cubic meters more than the "drilling rig + splitting machine" combination, and the cost of 2 coordination personnel is saved.   Application scenarios are more linked: In municipal demolition, first cooperat…

Similar

Precision Mining Drilling Equipment with Remote Control
high performance Drilling Machine for Geological Boreholes
Efficient Hydraulic drilling rig for Metal mine construction
Custom CNC Milling Solutions for Railway Tunnel Construction
well DTH Drill Rig for Deep Hole Applications
Crawler DTH Drill Rig for Efficient Mining Operations
Solar-Powered Drilling Rig for Efficient Excavation
Core Drilling Rig for Railway and Tunnel Construction
Excavator Drilling Machine for Underground Projects
Hydraulic Rock Drilling Machine for Construction Sites
Custom Portable Hydraulic Blasting Rig for Power Engineering
Advanced Hydraulic drilling rigs for mining operations

Jiangsu Aneng Drilling Equipment Technology Co., Ltd.

Jiangsu Aneng Drilling Equipment Technology Co., Ltd. is located in Xuzhou, the capital of China's e…

Copyrights © 2025 astszcmparts.com All Rights.Reserved .