Core Installation Process
﹥﹥ Preliminary Survey & Design
Site selection: Choose locations with sufficient sunlight exposure and no obstructions. Assess terrain, wind direction, and load-bearing capacity.
Layout design: Determine the support structure based on parking space capacity and optimal solar panel tilt angle (typically aligned with local latitude) to maximize energy efficiency.
Electrical planning: Design cable routing, inverter placement, grid-connection/energy storage solutions, and reserve interfaces for EV charging piles.
﹥﹥ Foundation Construction
Concrete foundation: Excavate pits, install rebar cages, embed anchor bolts/fixings, and pour concrete.
Innovation: Some modern carports adopt prefabricated foundations or portable designs to eliminate civil engineering work.
Curing period: Allow concrete to cure for 7-14 days to ensure load-bearing compliance.
﹥﹥ Support Structure Installation
Column fixation: Align steel columns vertically with pre-embedded bolts and…